SV Creeky To Do, as of August 2016

While we haven’t had much time to do boat work lately, we’ve had a lot of conversations in passing about what we need to do. Feeling a bit restless, we sat down last night to make a list of everything major that needs doing in the hopes of prioritizing some of the projects. This is what our current To Do list looks like — and may I point out that you can’t spell “Creeky” without “eek!”

Battery bank

Build support boxes

Buy batteries

Run cables

 

Cockpit

Install cockpit benches

Design and install an aft cockpit bench

Build a propane locker

Re-do lazarette access

Re-do steering pedestal and control box

Engine hatch

Paint cockpit

 

Freshwater system

Finish water tanks

Install freshwater plumbing

Hot water?

 

Head

Install hatch

Design and install shower

Buy and install new toilet

Install holding tank

Design and build storage

Install sink faucets

 

Salon

Starboard settee

Install floor

Install ceiling panels

Finish port side

Install trim

Build and install dining table

Salon cushions (settee and chairs)

 

V-berth

V-berth cabinets

V-berth cushions

Reading lights

Ceiling

Battery enclosure

Shelves/drawers (closet area)

 

Aft cabin

Install hatch

Install floor and access hatches

Engine access hatch

Portlights

Hanging locker storage

 

Galley

Silicone sink and countertop edges

Relocate greywater system

Lid for storage compartment

Expand storage area across from galley

Fridge area/countertop

Chart table

Design and build chart table

 

Rigging/Outside

Bow plate

Anchor roller

Lifelines and stanchions

Davets

Dodger

Radar arch

Genoa tracks

Clutches

Cockpit winch

 

Dinghy

Rub rail

Spar

Seats

 

Doors, everywhere

Leave a Comment

Your email address will not be published. Required fields are marked *

*