While we haven’t had much time to do boat work lately, we’ve had a lot of conversations in passing about what we need to do. Feeling a bit restless, we sat down last night to make a list of everything major that needs doing in the hopes of prioritizing some of the projects. This is what our current To Do list looks like — and may I point out that you can’t spell “Creeky” without “eek!”
Battery bank
Build support boxes
Buy batteries
Run cables
Cockpit
Install cockpit benches
Design and install an aft cockpit bench
Build a propane locker
Re-do lazarette access
Re-do steering pedestal and control box
Engine hatch
Paint cockpit
Freshwater system
Finish water tanks
Install freshwater plumbing
Hot water?
Head
Install hatch
Design and install shower
Buy and install new toilet
Install holding tank
Design and build storage
Install sink faucets
Salon
Starboard settee
Install floor
Install ceiling panels
Finish port side
Install trim
Build and install dining table
Salon cushions (settee and chairs)
V-berth
V-berth cabinets
V-berth cushions
Reading lights
Ceiling
Battery enclosure
Shelves/drawers (closet area)
Aft cabin
Install hatch
Install floor and access hatches
Engine access hatch
Portlights
Hanging locker storage
Galley
Silicone sink and countertop edges
Relocate greywater system
Lid for storage compartment
Expand storage area across from galley
Fridge area/countertop
Chart table
Design and build chart table
Rigging/Outside
Bow plate
Anchor roller
Lifelines and stanchions
Davets
Dodger
Radar arch
Genoa tracks
Clutches
Cockpit winch
Dinghy
Rub rail
Spar
Seats
Doors, everywhere